GTAC Observation Log 1. Date : 18/6/2013 2. Observation Sr. No. : 6556 3. Observer : Jayanta Roy 4. Observer's Email : jroy@ncra.tifr.res.in 5. Project Name : Timing studies of millisecond pulsars discovered by the GMRT at the position of Fermi LAT sources 6. Project Code : 24_021 7. Operator(s) : Navanath, Pramod, Rupsingh, 8. Command File : /odisk/gtac/cmd/jroy/22_021.18jun.cmd 9. LTA File : /gsbifrdata/18jun/24_021_18jun2013.lta 10. LogFlag File : /odisk/online1/logflags/24_021.FLAGS.9 ANTENNA SETTINGS : 11. RF Band(MHz) & Solar Attn(dB)- RF1 : 591 MHz ,RF2 : 591 MHz, SA1 : 0 dB, SA2 : 0 dB 12. Ist LO (MHz) & IVth LO (MHz): ILO1 : 540 MHz, ILO2 : 540 MHz , IVLO1 : 51 MHz, IVLO2 : 51 MHz 13. IF Attn(dB) , IF BW(MHz) & IF ALC : IF-CH1 : 4+12 dB, 32 MHz,ON, IF-CH2 : 4+12 dB, 32 MHz,ON GSB SETTINGS : 14. GSB Mode : RealTime 15. GSB LTA : 8 16. GAIN EQ : OFF 17. Stokes : Total_Intensity 18. Beam - 1 : IA 19. Beam - 2 : PA 20. ACQ BW : 32 MHz 21. Maximum Channels : 512 22. IFBW (MHz) : LO5 (KHz) : 32:149000-156000 23. Final Bandwidth (MHz): OFF MHz; Step # 0 24. Frequency Parameters (TPA) : 591 591 540 540 51 51. 25. Integration Time : 16.106 Sec. 26. No of Antennas Working(Fringing) :28 27. Name of Non-Working Antennas (with reason for each) : W05 :- ABC time out ( OFC cut) W06 :- ABC time out ( OFC cut) 28. Note for Backup :-- 29. Start and End Time of Obs.(IST): 17:35 - 23:07 30. ONLINE Machine : Shivneri 31. Comments (During Observations) : 17;35 : Started set-up for 610MHz. 17:49 : Phasing and power equalised done on 1154-350 an started command file. '/odisk/gtac/cmd/jroy/22_021.18jun.cmd' 23:07 : Stopped command file and closed observation session.