GTAC Observation Log 1. Date : 29/9/2013 2. Observation Sr. No. : 6725 3. Observer : Dipanjan Mitra,Willem Hermsen,Jason WilliamThomas Hessels,Lucian Kuiper,Joeri vanLeeuwen,Jelle de Plaa,Joanna M Rankin,Ben Stappers,Geoffrey Wright,Rahul Basu 4. Observer's Email : dmitra@ncra.tifr.res.in,W.Hermsen@sron.nl,hessels@astron.nl,L.M.Kuiper@sron.nl,leeuwen@astron.nl,J.de.Plaa@sron.nl,Joanna.Rankin@uvm.edu,Ben.Stappers@manchester.ac.uk,G.Wright@sussex.ac.uk,rbasu@ncra.tifr.res.in 5. Project Name : Simultaneous XMM-Newton Radio observations of the mode-switching radio pulsar PSR B1822-09 6. Project Code : 24_008 7. Operator(s) : Deepak,Nilesh,Rupsingh,Shilpa,Surender 8. Command File : 9. LTA File : /gsbifrdata1/30sep//24_008_30sep2013.lta, 10. LogFlag File : /odisk/online1/logflags/24_008.FLAGS.4, ANTENNA SETTINGS : 11. RF Band(MHz) & Solar Attn(dB)- RF1 : 591 MHz ,RF2 : 591 MHz, SA1 : 0 dB, SA2 : 0 dB 12. Ist LO (MHz) & IVth LO (MHz): ILO1 : 540 MHz, ILO2 : 540 MHz , IVLO1 : 51 MHz, IVLO2 : 51 MHz 13. IF Attn(dB) , IF BW(MHz) & IF ALC : IF-CH1 : 24+4 dB, 32 MHz,OFF, IF-CH2 : 24+4 dB, 32 MHz,OFF GSB SETTINGS : 14. GSB Mode : Realtime 15. GSB LTA : 8 16. GSB CTRL : ONLINE 17. GSB Fstop : ON 18. GAIN EQ : OFF, 19. Stokes : TotIntensity 20. Beam - 1 : IA 21. Beam - 2 : PA 22. ACQ BW : 33.33 MHz 23. Final BW : 33.333333 MHz; Step # 0 24. Maximum Channels : 256 25. Channel Numbers : 0:255:1 26. LO5 -1 : 149.00 27. LO5 -2 : 156.00 28. Frequency Parameters (TPA) : 591 591 540 540 51 51. 29. Integration Time : 2.013264 Sec. 30. No of Antennas Working(Fringing) at the begining :28 31. Name of Non-Working Antennas (with reason for each) : C12 - PC104. S03 - BLDC installation. 32. Note for Backup : 33. Start and End Time of Obs.(IST): 02:35 - 22:50 34. ONLINE Machine : Shivneri 35. No of Antennas Working(Fringing) at the end :27 36. Comments (During Observations) : 14:35 : Started set-up. 15:02 : Power eq and phasing done on 1833-096. 15:06 : Started scan on B1833-09. 16:15 : C13 servo problem. 21:00 : Scintillation from 21:00 to 21:35. 21:40 : Phasing on 1822-096. 21:41 : Started observation on B1822-09 22:50 : Stopped scan & observation session over.