GTAC Observation Log 1. Date : 04/09/2018 2. Observation Sr. No. : 10513 3. Observer : VisweshwarRam Marthi, Philippe Berger, Ue Li Pen, TirthankarRoy Choudhury, Tzu-Ching Chang, Kanan Kumar Datta, Bryan Gaensler, Yashwant Gupta, Suman Majumdar, Tessa Vernstrom 4. Observer's Email : vrmarthi@cita.utoronto.ca, pberger@cita.utoronto.ca, pen@cita.utoronto.ca, tirth@ncra.tifr.res.in, tcchang@asiaa.sinica.edu.tw, kanan.physics@presiuniv.ac.in, bgaensler@usyd.edu.au, ygupta@ncra.tifr.res.in, s.majumdar@imperial.ac.uk, vernstrom@dunlap.utoronto.ca 5. Project Name : Reviving EoR with the GMRT 6. Project Code : 34_118 7. Operator(s) : Navnath, Pramod, Sachin, Shilpa, Surender 8. Command File : /odisk/gtac/cmd 9. LTA File : /gsbifrdata1/02sep/34_118_02sep2018_gsb.lta 10. LogFlag File : ANTENNA SETTINGS : 11. RF Band(MHz) & Solar Attn(dB)- RF1 : 156 MHz ,RF2 : 156 MHz, SA1 : 0 dB, SA2 : 0 dB 12. Ist LO (MHz) & IVth LO (MHz): ILO1 : 218 MHz, ILO2 : 218MHz , IVLO1 : 62 MHz, IVLO2 : 62 MHz 13. IF Attn(dB) , IF BW(MHz) & IF ALC : IF-CH1 : 24+4 dB, 16 MHz,OFF, IF-CH2 : 24+4 dB, 16 MHz,OFF GSB SETTINGS : 14. GSB Host : gsbm1_shivneri 15. GSB Mode : Realtime 16. GSB LTA : 8 17. GSB CTRL : ONLINE 18. GSB Fstop : ON 19. GAIN EQ : OFF 20. Stokes : Total_Intensity 21. Beam - 1 : OFF 22. Beam - 2 : OFF 23. ACQ BW : 16.666666 MHz 24. Final BW : 0 MHz; Step # 0 25. Maximum Channels : 256 26. Channel Numbers : 0:255:1 27. LO5 -1 : 138 28. LO5 -2 : 167 29. Frequency Parameters (TPA) : 156 156 218 218 62 62 30. Integration Time : 16.1061 Sec 31. No of Antennas Working(Fringing) at the beginning :29 32. Name of Non-Working Antennas (with reason for each) : C10 : Large Offsets 33. Note for Backup : 34. Start and End Time of Obs.(IST): 03 Sep 2018 00:00:00 - 04 Sep 2018 01:00:00 35. ONLINE Machine : Lenyadri 36. No of Antennas Working(Fringing) at the end :28 37. Comments (During Observations) : 22:50 : Started set up. 23:20 : Power equalized done on 3C48. Halted the GSB and put ALC on. Switch GPS mode to EoR mode. 10:05 : W06 taken for surface refurbishment work. 01:00 : Stopped tracking and observation session over.