GTAC Observation Log 1. Date : 07/12/2020 2. Observation Sr. No. : 12648 3. Observer : Jayanta Roy Bhaswati Bhattacharyya Lina Levin Ben Stappers Paul Ray Shyam Sunder 4. Observer\'s Email : jroy@ncra.tifr.res.in 5. Project Name : Multi-frequency timing of millisecond \\r\\npulsars with the GMRT \\r\\n 6. Project Code : 39_060 7. Operator(s) : Navnath 8. Command File : /odisk/gtac/cmd/jroy/39_060_7dec.cmd 9. LTA File : /gsbifrdata1/07dec/39_060_07dec2020_band5_gsb.lta, /gwbifrdata1/07dec/39_060_07dec2020_band5_gwb.lta 10. LogFlag File : /odisk/online1/logflags/39_060.FLAGS.12 ANTENNA SETTINGS : 11. RF Band(MHz) & Solar Attn(dB)- RF1 : 1371 MHz ,RF2 : 1371 MHz, SA1 : 0 dB, SA2 : 0 dB 12. Ist LO (MHz) & IVth LO (MHz): ILO1 : 1320 MHz, ILO2 : 1320MHz , IVLO1 : 51 MHz, IVLO2 : 51 MHz 13. IF Attn(dB) , IF BW(MHz) & IF ALC : IF-CH1 : 4+14 dB, 32 MHz,ON, IF-CH2 : 4+14 dB, 32 MHz,ON GSB SETTINGS : 14. GSB Host : gsbm1_shivneri 15. GSB Mode : Realtime 16. GSB LTA : 8 17. GSB CTRL : ONLINE 18. GSB Fstop : ON 19. GAIN EQ : ON 20. Stokes : Total_Intensity 21. Beam - 1 : OFF 22. Beam - 2 : OFF 23. ACQ BW : 16.666666 MHz 24. Final BW : 4 MHz; Step # 1 25. Maximum Channels : 512 26. Channel Numbers : 0:511:1 27. LO5 -1 : 136.8499 28. LO5 -2 : 168.1501 29. Frequency Parameters (TPA) : 1371 1371 1320 1320 51 51 30. Integration Time : 8.053 Sec 31. No of Antennas Working(Fringing) at the beginning :28 32. Name of Non-Working Antennas (with reason for each) : C03 : Mechanical Work. S01 : No fringe 1420 MHz. 33. Note for Backup : 34. Start and End Time of Obs.(IST): 07 Dec 2020 07:00:00 - 07 Dec 2020 09:00:00 35. ONLINE Machine : Shivneri 36. No of Antennas Working(Fringing) at the end :28 37. RFI Status : 38. Comments (During Observations) : :::::::::::::: setup :- 1460 MHz LO, 400 MHz BW, LSB, 4K chann, Beam modes are: off, off, off, PA; beam_int=8 , LTA=4 :::::::::::::: gwb_gac.dat :::::::::::::: # GWB GAC configuration is as follows : # BEAM-4:130 :: C00 C01 C02 C04 C05 C06 C08 C09 C10 C11 C12 C13 C14 E02 E03 E04 E05 S02 S03 S04 W01 W02 W03 W04 W05 Total=25 # BEAM-4:175 :: C00 C01 C02 C04 C05 C06 C08 C09 C10 C11 C12 C13 C14 E02 E03 E04 E05 S02 S03 S04 W01 W02 W03 W04 W05 Total=25 07:00:00 : Started setup. 07:10:00 : Power eq done on 1154-350. 07:14:29 : Started scan on 1154-350 for ~ 1.07374 min. 07:17:41 : Started scan on 1154-350 for ~ 1.14085 min. 07:20:00 : Phasing done and GAC Configured. : Started cmd file. /odisk/gtac/cmd/jroy/39_060_7dec.cmd 07:21:28 : Started scan on J1207-5050 for ~ 60.3979 min. 08:24:24 : Started scan on 1526-138 for ~ 1.14085 min. 08:25:42 : Started scan on 1526-138 for ~ 0.939523 min. 08:28:51 : Started scan on J1640+2224 for ~ 15.435 min. 08:45:12 : Started scan on J1713+0747 for ~ 16.1061 min. 09:00:00 : observation session over. -------------------------------------------------------------