GTAC Observation Log 1. Date : 24/01/2015 2. Observation Sr. No. : 7566 3. Observer : Jayanta Roy, Maura Ann McLaughlin, Scott M. Ransom, Bhaswati Bhattacharyya, Duncan Ross Lorimer, Lina Levin 4. Observer's Email : jayanta.roy@manchester.ac.uk, maura.mclaughlin@mail.wvu.edu, sransom@nrao.edu, bhaswati.bhattacharyya@manchester.ac.uk, Duncan.Lorimer@mail.wvu.edu, lina.s.levin@gmail.com 5. Project Name : Coherently dedispersed timing studies at the GMRT for IPTA MSPs 6. Project Code : 27_043 7. Operator(s) : Nilesh 8. Command File : /odisk/gtac/cmd/jroy/27_043_24jan.cmd 9. LTA File : /gsbifrdata/24jan/27_043_24jan2015_2s.lta 10. LogFlag File : /odisk/online1/logflags/27_043.FLAGS.5 ANTENNA SETTINGS : 11. RF Band(MHz) & Solar Attn(dB)- RF1 : 306 MHz ,RF2 : 306 MHz, SA1 : 0 dB, SA2 : 0 dB 12. Ist LO (MHz) & IVth LO (MHz): ILO1 : 255 MHz, ILO2 : 255MHz , IVLO1 : 51 MHz, IVLO2 : 51 MHz 13. IF Attn(dB) , IF BW(MHz) & IF ALC : IF-CH1 : 24+14 dB, 32 MHz,OFF, IF-CH2 : 24+14 dB, 32 MHz,OFF GSB SETTINGS : 14. GSB Host : gsbm1 15. GSB Mode : Realtime 16. GSB LTA : 8 17. GSB CTRL : ONLINE 18. GSB Fstop : ON 19. GAIN EQ : OFF 20. Stokes : Total_Intensity 21. Beam - 1 : IA 22. Beam - 2 : OFF 23. ACQ BW : 33.333333 MHz 24. Final BW : 33.333333 MHz; Step # 25. Maximum Channels : 512 26. Channel Numbers : 0:511:1 27. LO5 -1 : 149 28. LO5 -2 : 156 29. Frequency Parameters (TPA) : 306 306 255 255 51 51 30. Integration Time : 16.1061 Sec 31. No of Antennas Working(Fringing) at the beginning :28 32. Name of Non-Working Antennas (with reason for each) : E04 : Cable tray installation. W04 : P3 item work. 33. Note for Backup : 34. Start and End Time of Obs.(IST): 24 Jan 2015 08:00:00 - 24 Jan 2015 13:00:00 35. ONLINE Machine : Shivneri 36. No of Antennas Working(Fringing) at the end :27 37. Comments (During Observations) : 08:20 : Started settings for observation. Trial version GUI, 32MHz, TotalInt,IA-OFF,512chan, ALCoff, Power eq @ 300 counts on 1830-360. 08:38 : Started command file. 10:24 : C01 taken for maintenance. 10:26 : S-arm electrical power reset. 10:32 : S-arm electrical power reset. 10:38 : S01 time out after power reset. 10:40 : W06 taken for maintenance. 11:34 : W06 released for observation. 12:10 : W06 and S01 started working. 13:03 : Stopped observation session.