GTAC Observation Log 1. Date : 14/03/2015 2. Observation Sr. No. : 7673 3. Observer : Megan DeCesar, Scott M. Ransom, Jayanta Roy, Bhaswati Bhattacharyya, David Kaplan, Paul Ray 4. Observer's Email : megandecesar@gmail.com, sransom@nrao.edu, jroy@ncra.tifr.res.in, bhaswati.bhattacharyya@manchester.ac.uk, dkaplan@kitp.ucsb.edu, paul.ray@nrl.navy.mil 5. Project Name : GMRT Observations of the Highly Eccentric Binary Millisecond Pulsar in NGC 6652 6. Project Code : 27_056 7. Operator(s) : Nilesh 8. Command File : /odisk/gtac/cmd/jroy/27_056_14mar.cmd 9. LTA File : /gsbifrdata/14mar/27_056_14mar2014.lta 10. LogFlag File : /odisk/online1/logflags/27_056.FLAGS.5 ANTENNA SETTINGS : 11. RF Band(MHz) & Solar Attn(dB)- RF1 : 591 MHz ,RF2 : 591 MHz, SA1 : 0 dB, SA2 : 0 dB 12. Ist LO (MHz) & IVth LO (MHz): ILO1 : 540 MHz, ILO2 : 540MHz , IVLO1 : 51 MHz, IVLO2 : 51 MHz 13. IF Attn(dB) , IF BW(MHz) & IF ALC : IF-CH1 : 24+4 dB, 32 MHz,OFF, IF-CH2 : 24+4 dB, 32 MHz,OFF GSB SETTINGS : 14. GSB Host : gsbm1 15. GSB Mode : Realtime 16. GSB LTA : 8 17. GSB CTRL : ONLINE 18. GSB Fstop : ON 19. GAIN EQ : ON 20. Stokes : Total_Intensity 21. Beam - 1 : PA 22. Beam - 2 : PA 23. ACQ BW : 33.333333 MHz 24. Final BW : 33.333333 MHz; Step # 25. Maximum Channels : 512 26. Channel Numbers : 0:511:1 27. LO5 -1 : 149 28. LO5 -2 : 156 29. Frequency Parameters (TPA) : 591 591 540 540 51 51 30. Integration Time : 2.0132 Sec 31. No of Antennas Working(Fringing) at the beginning :21 32. Name of Non-Working Antennas (with reason for each) : W05 : : Feed Cage Painting. W06 : : Frequently getting Reset. S04 : : ABC time out. S06 : : NO fringe C02 : : No fringe@130 pol. C10 : : No feed@235MHz. W01 : : No feed@235MHz. W04 : : Low fringe@175 pol W03 : : MCM 5 time out. 33. Note for Backup : 34. Start and End Time of Obs.(IST): 14 Mar 2015 10:00:00 - 14 Mar 2015 12:00:00 35. ONLINE Machine : Lenyadri 36. No of Antennas Working(Fringing) at the end :21 37. Comments (During Observations) : 10:00 : Started settings. 10:15 : Started power eq @ 300 counts on 1822-06 10:30 : Started phasing on 1822-096. 10:36 : Started command file. 10:40 : Intermittent BUFFER LOSS. 10:44 : Reconfigured GAC, and re-started scan. 10:50 : CONTINUOUS BUFFER LOSS observaed at GSB ACQ. searched for processes and jobs in background but nothing found. 11:12 : Stopped observation, Due to BUFFER LOSS.