GTAC Observation Log 1. Date : 27/11/2016 2. Observation Sr. No. : 9023 3. Observer : BHAL CHANDRA JOSHI, Gopakumar Achamveedu, Manjari Bagchi, Mayuresh Surnis, Yogesh Maan, ARUN KUMAR NAIDU, Periasamy K. Manoharan, Krishnakumar MA 4. Observer's Email : bcj@ncra.tifr.res.in, gopu.tifr@gmail.com, manjari.bagchi@gmail.com, mpsurnis@ncra.tifr.res.in, ymaan@ncra.tifr.res.in, arun@ncra.tifr.res.in, mano@ncra.tifr.res.in, kkma@ncra.tifr.res.in 5. Project Name : Extending timing baseline for the pilot proposal for Indian Pulsar Timing Array (InPTA) 6. Project Code : 31_107 7. Operator(s) : Deepak, Nilesh, Pramod, Shilpa 8. Command File : /odisk/gtac/cmd 9. LTA File : /gsbifrdata/27nov/31_107_27nov2016.lta 10. LogFlag File : /odisk/online1/logflags/31_107.FLAGS ANTENNA SETTINGS : 11. RF Band(MHz) & Solar Attn(dB)- RF1 : 1292 MHz ,RF2 : 1292 MHz, SA1 : 0 dB, SA2 : 0 dB 12. Ist LO (MHz) & IVth LO (MHz): ILO1 : 1230 MHz, ILO2 : 1230MHz , IVLO1 : 62 MHz, IVLO2 : 62 MHz 13. IF Attn(dB) , IF BW(MHz) & IF ALC : IF-CH1 : 24+4 dB, 16 MHz,OFF, IF-CH2 : 24+4 dB, 16 MHz,OFF GSB SETTINGS : 14. GSB Host : gsbm1_lenyadri 15. GSB Mode : Realtime 16. GSB LTA : 8 17. GSB CTRL : ONLINE 18. GSB Fstop : ON 19. GAIN EQ : OFF 20. Stokes : Total_Intensity 21. Beam - 1 : OFF 22. Beam - 2 : Volt 23. ACQ BW : 16.666666 MHz 24. Final BW : 0 MHz; Step # 0 25. Maximum Channels : 256 26. Channel Numbers : 0:255:1 27. LO5 -1 : 138 28. LO5 -2 : 167 29. Frequency Parameters (TPA) : 1292 1292 1230 1230 62 62 30. Integration Time : 8.053 Sec 31. No of Antennas Working(Fringing) at the beginning :29 32. Name of Non-Working Antennas (with reason for each) : W04 : For painting. 33. Note for Backup : 34. Start and End Time of Obs.(IST): 27 Nov 2016 10:00:00 - 27 Nov 2016 18:00:00 35. ONLINE Machine : Lenyadri 36. No of Antennas Working(Fringing) at the end :28 37. Comments (During Observations) : GAC Config : C00 C01 C02 C03 C04 C05 C06 C08 C09 C11 C12 C13 C14 E02 E03 S01 S02 W01 W02 --------------------------------------------------------------------------- 10:00 : Started settings. 10:30 : Power equalized on 1822-096 @ 200 counts. 10:42:04 : Phasing done on 1822-096. 10:45:45 : Started scan on J1600-3053 for ~ 38.9231 min. 11:31:02 : Phasing done on 1822-096. 11:33:06 : Started scan on J1643-1224 for ~ 41.2048 min. 12:19:00 : Phasing done on 1822-096. 12:20:54 : Started scan on J1713+0747 for ~ 36.5072 min. 13:02:00 : Phasing done on 1822-096. 13:05:02 : Started scan on B1855+09 for ~ 46.1709 min. 13:56:00 : Phasing done on 1822-096. 14:00:34 : Started scan on J1909-3744 for ~ 46.1709 min. 14:52:00 : Phasing done on 1822-096. 14:57:52 : Started scan on B1937+21 for ~ 15.71088 min. 15:21 : C12 remove from GAC because of servo problem. 15:23:08 : Phasing done on 1822-096. 15:26:53 : Started scan on J2124-3358 for ~ 42.0101 min. 16:13:23 : Phasing done on 1822-096. 16:18:53 : Started scan on J2145-0750 for ~ 36.1045 min. 16:59:41 : Phasing done on 1822-096. 17:07:00 : Started scan on J2317+1439 for ~ 41.0706 min. 17:50:12 : Started scan on 3C48 for ~ 2.01326 min. 17:53:58 : Started scan +5d off on 3C48 for ~ 1.34218 min. 17:55 : Stopped scan and observation session is over.