GTAC Observation Log 1. Date : 19/05/2017 2. Observation Sr. No. : 9404 3. Observer : Paulo Cesar Freire, Yashwant Gupta, Alessandro Ridolfi 4. Observer's Email : pfreire@mpifr-bonn.mpg.de, ygupta@ncra.tifr.res.in, ridolfi@mpifr-bonn.mpg.de 5. Project Name : Determining the masses of the components of two binary pulsars 6. Project Code : 32_083 7. Operator(s) : Sachin, Surender 8. Command File : /odisk/gtac/cmd 9. LTA File : /gsbifrdata1/19may/32_083_19may2017.lta, /gwbifrdata1/19may/32_083_19may2017.lta 10. LogFlag File : /odisk/online1/logflags/32_083.FLAGS.11 ANTENNA SETTINGS : 11. RF Band(MHz) & Solar Attn(dB)- RF1 : 306 MHz ,RF2 : 306 MHz, SA1 : 0 dB, SA2 : 0 dB 12. Ist LO (MHz) & IVth LO (MHz): ILO1 : 255 MHz, ILO2 : 255MHz , IVLO1 : 51 MHz, IVLO2 : 51 MHz 13. IF Attn(dB) , IF BW(MHz) & IF ALC : IF-CH1 : 4+14 dB, 32 MHz,ON, IF-CH2 : 4+14 dB, 32 MHz,ON GSB SETTINGS : 14. GSB Host : gsbm1_shivneri 15. GSB Mode : Realtime 16. GSB LTA : 8 17. GSB CTRL : ONLINE 18. GSB Fstop : ON 19. GAIN EQ : OFF 20. Stokes : Total_Intensity 21. Beam - 1 : PA 22. Beam - 2 : PA 23. ACQ BW : 33.333333 MHz 24. Final BW : 0 MHz; Step # 0 25. Maximum Channels : 512 26. Channel Numbers : 0:511:1 27. LO5 -1 : 149 28. LO5 -2 : 156 29. Frequency Parameters (TPA) : 306 306 255 255 51 51 30. Integration Time : 16.1061 Sec 31. No of Antennas Working(Fringing) at the beginning :21 32. Name of Non-Working Antennas (with reason for each) : C02 : : MCM 2 time-out. C12 : : Servo Problem. C13 : : Servo Problem. E03 : : Servo Problem. W01 : : Servo Problem. W02 : : Servo Problem. S01 : : Servo Problem. C14 : : Taken for Mech Work. W03 : : Taken for Mech Work. 33. Note for Backup : 34. Start and End Time of Obs.(IST): 19 May 2017 16:00:00 - 19 May 2017 17:00:00 35. ONLINE Machine : Lenyadri 36. No of Antennas Working(Fringing) at the end :20 37. Comments (During Observations) : # GSB GAC configuration is as follows : # BEAM-1:130 C00 C01 C03 C04 C05 C06 C08 C09 C10 C11 E02 S02 S03 Total=13 # BEAM-1:175 C00 C01 C03 C04 C05 C06 C08 C09 C10 C11 E02 S02 S03 Total=13 # BEAM-2:130 C00 C01 C03 C04 C05 C06 C08 C09 C10 C11 E02 S02 S03 Total=13 # BEAM-2:175 C00 C01 C03 C04 C05 C06 C08 C09 C10 C11 E02 S02 S03 Total=13 -------------------------------------------------- -------------------------------------------------- RF selection : Band-3 with 200 MHz BW in GWB LO = 500 MHz, 200 MHz LPF ==> Final band : 500 to 300 MHz (LSB signal), OF attenuation of 12+12 dB Backend settings : Interferometer in total intensity; 2048 channels; standard LTA integration; Pulsar mode : Beam1 - IA & Beam2 - PA (both total intensity) with data recording on gwbh7 & gwbh8; 2048 channels & beam integration = 8 (sampling of 81.92 microsecond) ------------------------------------------------- ------------------------------------------------- # GWB GAC configuration is as follows : # BEAM-1:130 :: C00 C01 C02 C03 C04 C05 C06 C08 C09 C10 C11 E02 S02 S03 Total=14 # BEAM-1:175 :: C00 C01 C02 C03 C04 C05 C06 C08 C09 C10 C11 E02 S02 S03 Total=14 # BEAM-2:130 :: C00 C01 C02 C03 C04 C05 C06 C08 C09 C10 C11 E02 S02 S03 Total=14 # BEAM-2:175 :: C00 C01 C02 C03 C04 C05 C06 C08 C09 C10 C11 E02 S02 S03 Total=14 # BEAM-3:130 :: Total=0 # BEAM-3:175 :: Total=0 # BEAM-4:130 :: Total=0 # BEAM-4:175 :: Total=0 -------------------------------- -------------------------------- 15:05 : Started set-up. ----------------------------------------------------------------------- 15:36:23 : Started scan on 0837-198 for ~ 4.26141 min. 15:43:28 : Power eq and Phasing done on 0837-198. 15:58:29 : Started scan on 0837-198 for ~ 1.04019 min. 16:02:25 : Started scan on J0520-2553 for ~ 3.28833 min. 16:07:59 : Started scan on J0514-4002A for ~ 40.2988 min. 16:17:00 : W04 ABC time-out. 16:54:06 : Started scan on J0520-2553 for ~ 3.28833 min. 17:00:00 : Stopped scan and observing session over.